Past Performance

The flexibility, patience, and professionalism that CMS Construction delivers to every job has resulted in high quality work with outstanding performance reviews on previously completed federal projects. The CMS Construction team has proven to be highly effective communicators, taking great pride in our work ethic and end product.

With a total of 15 CPARS projects, CMS has performed with an Exceptional rating on 5 federal projects and Very Good on the 10 additional federal projects.

A classroom with wooden furniture, including small tables and chairs, shelves with books and educational materials, an easel, and a kitchenette with a fridge and sink. Large windows line one wall.
Icon of a white house with a green background, showcasing a window with sparkles and a shovel on the left side, all framed within a hexagon.

Representative
Projects

NASA Building Envelopes; Edwards AFB, CA 80AFRC23PA007 (NASA Armstrong Flight Research Center)

CMS is performing as the prime contractor for the design and construction to remove and replace 72,000-sf of roofing on occupied buildings 4800 and 4801 located on the flight line. Project scope includes demolition and lead/ asbestos abatement of obsolete structures and equipment at multiple roof levels, fabrication/installation of new galvanized metal work platforms, ramps,…

Project Duration:

10/18/2023-Current


Project Value:

$5,349,654.00


POC:

Cacie Carillo

Call

Email

Read More...

Beale AFB SATCOM Restrooms; Beale AFB, CA FA468623C0025 (FA4686 9 CONS LGC):

CMS performed as the prime contractor to renovate 12 existing restrooms in buildings 5760, 5764, 5768, and 5771. Project scope included demolition and lead/asbestos abatement, rough plumbing, replacement of isolation valves and all plumbing fixtures, drywall, paint, LED lighting, ceramic tile, floating counter tops, restroom partitions, ADA handrails, and all restroom accessories. Because these buildings…

Project Duration:

01/03/2024 - 04/08/2024


Project Value:

$918,120.53


POC:

Phillip Manwaring

Call

Email

Read More...

B103 Renovations NSWC; Fallbrook, CA N6426722C0020 (Naval Surface Warfare Center Corona Division)

CMS performed as the prime contractor for the design and construction to convert approximately 7,000 sf of administrative office space into working laboratory space, to include an Open Secret Storage (OSS) lab. The work included demolition and abatement of hazardous materials, plumbing, HVAC, electrical, telecom, fire alarm mass notification, fire sprinklers, telecom, custom casework, acoustic…

Project Duration:

04/06/2023-02/17/2024


Project Value:

$4,300,000.00


POC:

Kimhoang Chu

Call

Email

Read More...

B4150 CDC-Active Playroom Addition; Fort Irwin, CA W912PL22C0030 (USACE, Los Angeles)

CMS performed as the prime contractor to construct a new Infant and pre-toddler active play building for the children of soldiers and families. Project scope included site improvements, steel framing, roofing, EIFIS, fire sprinklers, fire alarm mass notification system, electrical, HVAC, domestic water, wastewater, natural gas, structural concrete, site concrete, ATFP doors and windows, CCTV,…

Project Duration:

12/05/2022-11/25/2023


Project Value:

$3,048,832.00


POC:

Randi Elder

Call

Email

Read More...

Parcel 19 Modular Buildings, NBVC Port Hueneme, CA (Modular Concepts, Inc.)

CMS performed as the primary underground subcontractor for a 14,180-sf high security modular complex. Earthwork included layout, sawcut and removal of AC paving, trenching and shoring, backfill, compaction and AC paving. Underground utility installation included domestic water, fire suppression and hydrant, sewer, high-voltage electrical and transformers, telephone, and data. CMS self-performed 40% of the contract…

Project Duration:

2/21/2022-02/06/2023


Project Value:

$1,485,000.00


POC:

Rebecca Palluth

Call

Email

Read More...

Naval Base Ventura County PH1100 Renovation of Room D-105 W912PL21D0032/W912PL21F0103 (USACE, Los Angeles)

CMS performed as the prime contractor to convert an unclassified storage room into an ICD705 compliant SCIF and connect to an adjacent existing SCIF without compromising its accreditation. CMS helped the customer define the SOW and budget through a series of joint scoping design meetings. Project scope included new ICD705 compliant wall assemblies, ceilings, sound…

Project Duration:

12/06/2021-05/08/2022


Project Value:

$2,000,000.00


POC:

Robert Ramos

Call

Email

Read More...

B37 Sam Adams, Fort Irwin, CA W912PL20C0053 (USACE, Los Angeles)

CMS Construction served as Prime Contractor on this D/B interior-exterior renovation and repair of a 23,000-SF commercial building on an active military installation for USACE. This project included renovating the Desert Oasis Restaurant, Sam Adams Brewhouse, Leaders Bar, and three large event rooms in an event and catering center at Fort Irwin, CA. Work was…

Project Duration:

01/07/2021-12/16/2021


Project Value:

$3,410,431.00


POC:

Randi Elder

Call

Email

Read More...

ATFP Upgrades, San Bruno, CA W912HP20C3305 (USACE, Charleston/USACE Sacramento)

CMS performed as the prime contractor for the design and construction of new security upgrades, to include new perimeter security fencing, vehicular gates, pedestrian gates, and vehicle bollards, cable reinforce existing fencing, new wall mounted external lighting and light poles, directionally boring underground utilities, new CCTV system, new Access Control System, site concrete and AC…

Project Duration:

09/30/2020-09/29/2021


Project Value:

$3,063,597.04


POC:

Shirley Lawson

Call

Email

Read More...
Icon of a white house with a green background, showcasing a window with sparkles and a shovel on the left side, all framed within a hexagon.

Representative Projects

NASA Building Envelopes; Edwards AFB, CA 80AFRC23PA007 (NASA Armstrong Flight Research Center)

CMS is performing as the prime contractor for the design and construction to remove and replace 72,000-sf of roofing on occupied buildings 4800 and 4801 located on the flight line. Project scope includes demolition and lead/ asbestos abatement of obsolete structures and equipment at multiple roof levels, fabrication/installation of new galvanized metal work platforms, ramps,…

Project Duration:

10/18/2023-Current


Project Duration:

$5,349,654.00


POC:

Cacie Carillo

Call

Email

Read More...

Beale AFB SATCOM Restrooms; Beale AFB, CA FA468623C0025 (FA4686 9 CONS LGC):

CMS performed as the prime contractor to renovate 12 existing restrooms in buildings 5760, 5764, 5768, and 5771. Project scope included demolition and lead/asbestos abatement, rough plumbing, replacement of isolation valves and all plumbing fixtures, drywall, paint, LED lighting, ceramic tile, floating counter tops, restroom partitions, ADA handrails, and all restroom accessories. Because these buildings…

Project Duration:

01/03/2024 - 04/08/2024


Project Duration:

$918,120.53


POC:

Phillip Manwaring

Call

Email

Read More...

B103 Renovations NSWC; Fallbrook, CA N6426722C0020 (Naval Surface Warfare Center Corona Division)

CMS performed as the prime contractor for the design and construction to convert approximately 7,000 sf of administrative office space into working laboratory space, to include an Open Secret Storage (OSS) lab. The work included demolition and abatement of hazardous materials, plumbing, HVAC, electrical, telecom, fire alarm mass notification, fire sprinklers, telecom, custom casework, acoustic…

Project Duration:

04/06/2023-02/17/2024


Project Duration:

$4,300,000.00


POC:

Kimhoang Chu

Call

Email

Read More...

B4150 CDC-Active Playroom Addition; Fort Irwin, CA W912PL22C0030 (USACE, Los Angeles)

CMS performed as the prime contractor to construct a new Infant and pre-toddler active play building for the children of soldiers and families. Project scope included site improvements, steel framing, roofing, EIFIS, fire sprinklers, fire alarm mass notification system, electrical, HVAC, domestic water, wastewater, natural gas, structural concrete, site concrete, ATFP doors and windows, CCTV,…

Project Duration:

12/05/2022-11/25/2023


Project Duration:

$3,048,832.00


POC:

Randi Elder

Call

Email

Read More...

Parcel 19 Modular Buildings, NBVC Port Hueneme, CA (Modular Concepts, Inc.)

CMS performed as the primary underground subcontractor for a 14,180-sf high security modular complex. Earthwork included layout, sawcut and removal of AC paving, trenching and shoring, backfill, compaction and AC paving. Underground utility installation included domestic water, fire suppression and hydrant, sewer, high-voltage electrical and transformers, telephone, and data. CMS self-performed 40% of the contract…

Project Duration:

2/21/2022-02/06/2023


Project Duration:

$1,485,000.00


POC:

Rebecca Palluth

Call

Email

Read More...

Naval Base Ventura County PH1100 Renovation of Room D-105 W912PL21D0032/W912PL21F0103 (USACE, Los Angeles)

CMS performed as the prime contractor to convert an unclassified storage room into an ICD705 compliant SCIF and connect to an adjacent existing SCIF without compromising its accreditation. CMS helped the customer define the SOW and budget through a series of joint scoping design meetings. Project scope included new ICD705 compliant wall assemblies, ceilings, sound…

Project Duration:

12/06/2021-05/08/2022


Project Duration:

$2,000,000.00


POC:

Robert Ramos

Call

Email

Read More...

B37 Sam Adams, Fort Irwin, CA W912PL20C0053 (USACE, Los Angeles)

CMS Construction served as Prime Contractor on this D/B interior-exterior renovation and repair of a 23,000-SF commercial building on an active military installation for USACE. This project included renovating the Desert Oasis Restaurant, Sam Adams Brewhouse, Leaders Bar, and three large event rooms in an event and catering center at Fort Irwin, CA. Work was…

Project Duration:

01/07/2021-12/16/2021


Project Duration:

$3,410,431.00


POC:

Randi Elder

Call

Email

Read More...

ATFP Upgrades, San Bruno, CA W912HP20C3305 (USACE, Charleston/USACE Sacramento)

CMS performed as the prime contractor for the design and construction of new security upgrades, to include new perimeter security fencing, vehicular gates, pedestrian gates, and vehicle bollards, cable reinforce existing fencing, new wall mounted external lighting and light poles, directionally boring underground utilities, new CCTV system, new Access Control System, site concrete and AC…

Project Duration:

09/30/2020-09/29/2021


Project Duration:

$3,063,597.04


POC:

Shirley Lawson

Call

Email

Read More...